Bernice Kimani

Post tension for LEED certification

With the high carbon footprint generated by construction projects, there has been an increasing need for greener buildings that use conscious technologies to reduce this massive carbon footprint. LEED certification system was developed to rank and score construction projects, this certification focuses on green building design and construction practices i.e., sustainable site planning, safeguarding water […]

Post tension for LEED certification Read More »

POST-TENSIONING SOLUTION FOR LONG SPANS IN BUILDINGS.

For a long time, large spans in buildings have posed a design challenge to consultants who have to strike a balance between longer clear spans and increased dimensions of structural members. Architectural designs favor larger spans for design simplicity and aesthetics, while structural design leans towards shorter spans with closely spaced supports for a more

POST-TENSIONING SOLUTION FOR LONG SPANS IN BUILDINGS. Read More »

STEEL PRICES ARE UP 30%, POST TENSION YOUR SLABS.

Steel prices have increased globally by 30% causing a spike in construction costs in the real estate industry. This has consequently affected the prevailing housing prices making home ownership an increasingly costly endeavor for new homeowners. In time there is a significant reduction in the uptake of housing as mortgage financing rates go beyond the

STEEL PRICES ARE UP 30%, POST TENSION YOUR SLABS. Read More »

POST TENSION TECHNOLOGY COST SAVING IN CONSTRUCTION.

With advancement in building technologies, builders have tried out various systems to address construction challenges and improve efficiency in projects. Over time, some systems have proven to be better suited as regards ease of execution and cost savings on site. One of the systems tried out extensively in building construction is post tension technology. In

POST TENSION TECHNOLOGY COST SAVING IN CONSTRUCTION. Read More »

Diamond Plaza Multi-storey Building.

Diamond Plaza Multi-storey Building. Diamond Plaza building is a 17-story Mixed-use building in Parklands, Nairobi, with malls, restaurants, and offices. During its construction, there was a change of design proposal by the client. The design change entailed an additional five floors on top of the original building. Somers Engineering was engaged to re-design and retrofit

Diamond Plaza Multi-storey Building. Read More »

Post-Tensioned Bridge, Nakivubo Channel Kampala.

After the completion of construction on a commercial building in Kampala Central business district, there was a need to provide vehicular access to the building from the city centre, across the Nakivubo channel. Therefore, to address this need, a bridge was designed to span over the 13-meter-wide drainage channel. Somers Engineering was appointed to design,

Post-Tensioned Bridge, Nakivubo Channel Kampala. Read More »

Post Tensioning on Holy Family Basilica – Parking Silo, Nairobi

Post tensioning is a method of prestressing concrete which employs use of high strength steel tendons, that are stressed after concrete placement. Post tensioning allows for the reduction in quantity of reinforcement, longer spans with fewer supports and thinner structural members, thereby reducing material quantities. Holy Family Basilica project is a 4-level basement parking silo