Case Studies

Post Tensioning

  • Sarit Centre (Parking Silo and Retail Shops) Nairobi, Kenya 2017-2018 -37175 SM
  • Holy Basillica Parking Silo -2018-2019 – 12000 SM
  • Bridges in Kampala, Uganda 2019 – 3 No Bridges each of 12m long with 17 beams
  • PVS Temples Nairobi, Kenya 2018-2019 – 49 No slab Beams for 4 floors
  • Queen of Apostles Nairobi, Kenya 2019-2020 – 4 No roof beams

Beam and Block Concrete Flooring System

  • Nanyuki Municipal Block (2017) -875 SM of ground floor slab
  • Residential House in Kimende (2018-2019)– 2620 SM of Slabs
  • Residential House in Kitengela (2018)- 630 SM of Ground floor and First floor Slabs
  • Residential House in Ruiru (2019)- 421 SM of First floor and terrace
  • Sports Hall for School in Lavington (2019)- 998 SM of Suspended Ground Floor
  • School in Kemende (2018)
  • Cottages in Diani(2018)- 530 SM of First floor and 470 SM of Roof Terrace
  • Mezzanine Floor for Olesereni Hotel Nairobi (2018)- 300 SM
  • Extension of Temple Slab (2019)- 70 SM
  • Office Block at Wilson Airport (2018) -540 SM of First and Second floor.
  • Villas in Rosslyn Valley (2019) -260 SM of First floor slab
  • Residential House Runda (2019)- 260 SM of First floor slab
  • Nest, Mother and Babies (2019) -461 SM of suspended ground floor slab
  • Residential House in Karen (2019)- 867 SM of slabs
  • Queen of apostles Roof Slab (2019) – 625 SM of Roof Slab
  • Apartment in Konza City (2019-2020) – 839 SM of slab.
  • Godown in Industrial Area (2020) – 340 SM of slabs
  • Residential House in Kwale (2020)- 785 SM of slabs

Structural investigation and retrofitting

  • Repair of cracks in concrete silo to restore the integrity of the concrete. (2019)
  • Structural strenghtening of columns at bank of baroda, muththi road, nairobi. (2019)
  • Structural rectification of proposed mixeduse building for albert supply,kigali,rwanda (2017)
  • Rehabilitation of cido bridge on nebbi-goli-japanziri-erussi road , nebbi district, uganda (2017)
  • Structural rectification of cogebanque,kigali, rwanda (2016)
  • Retrofitting of new diamond plaza(17floors) for earthquake and vertical extension, nairobi, kenya (2015)
  • Structural appraisal of pride inn hotel,Kisumu (2015)
  • West Nile Rural Electrification Company Ltd. Nyagak I Hydro Power Plant (2012)
  • Structural assessment of alibhai shariff building (2009)
  • Structural assessment of kenya airways hangar ii annexes (2009)
  • Structural inspection of fourth / fifth floor slab at parkside towers (2009)
  • Structural investigation of Cooperative House after US Embassy Bomb blast.(1998)

Concrete Fibers

  • Multi-Storey building in Nairobi. 9290 SM
  • Coca Cola Uganda. 10,000 SM
  • Transami Uganda 10,000 SM
  • Cottages and Houses with Hollow pot slabs Mombasa
  • Godowns for Oserian Flowers Naivasha
  • Tea Factory in Western Kenya 65000 SM Kakamega

Design and Build

  • Rehabilitation of Airside Pavements and Airfield Ground Lighting(AGL) System at Moi International Airport, Mombasa, Kenya. Construction of New Apron slab, Repair and Rehabilitation of existing Apron Slabs.
  • High grove Town Houses US$ 10.0M
  • Exeter investment US$ 4.0M
  • Mbuya apartment Uganda US$ 5.0M
  • Office of the President, South Sudan US$3.0M
  • Airtel Kenya
  • Development of Houses on Limuru road US$40 M
  • Sian Roses
  • Apartments on Riverside drive US$5.0M